Monday, January 27, 2020

The Varying Roles Of General Contractors Construction Essay

The Varying Roles Of General Contractors Construction Essay Many changes happen to a project during its life-cycle, the most significant of which is a change in the contractual relationship between the parties involved which is the objective of this dissertation to identify a feasible contractual solution to how a general contractor is able to act as both a main contractor and turnkey contractor within a single project. Keywords: collaboration, contract, general contractor, novation, private consortium, public authority, rights and responsibilities Introduction In a construction project there are several parties involved in the completion of the project. These parties can be from the public sector, the private sector or the third sector. The key parties are the owner/client, the architect/engineer and the general contractor. Between these parties there are business agreements in the form of contracts to complete the work in the project, such as: design, engineering, construction, management and maintenance. A construction project is ready for execution after the client/owner (hereafter called client) has completed the prerequisites such as decision on the scope of the project, acquires the funds, the land (site) and necessary approvals from the relevant authorities for the land use and the projects purpose. Upon meeting the criteria for establishing a project, the client will approach architects to submit designs for its selection, or provide a design and full construction specifications There are many ways in which the project could be executed. One way is when the client creates the project under a new company and establishes the various departments such as design, development, building and operations within that company and can execute the project with full control. Alternatively, dependent on many things such as the clients status (i.e. individual, company, consortium, government authority, funding agency, not-for-profit organization, international or regional development banks, etc.,), funding, site, etc., the project could be executed by the client using any of the construction works projects methods which will be later elaborated on in this document. Generally works contracts are awarded in two ways, as a turnkey contract where the client awards the entire project to a turnkey contractor or under a main contract where a general contractor gets to construct the significant portion of the facility (and the design and technical and services are sub-contracted by the client). Problem Statement During the project many changes could happen to the client-contractor relationship, the client and/or the contractor could be bought out by a competitor or investor, merged with another entity or liquidated and become insolvent. For the purpose of this dissertation, let us consider that the change has happened to the client and therefore the contractual relationship that existed with the previous owner and the general contractor is altered. For business reasons the new owner decides to change the relationship with the general contractor, and the general contractor is agreeable to that change to also act as a turnkey contractor for the project. Research Questions What kind of project will allow the general contractor to change its role? How can a general contractor act as both a main contractor and a turnkey contractor within a single project? Delimitation This study is written from a practical perspective, not legal, perspective, and focuses on the relationship between the client and general contractor in a building construction project to identify the parameters within which the general contractor is able to be both a main contractor and a turnkey contractor within a single project. Research Method The research for this study was conducted through qualitative and analytical methods from primary and secondary sources such as: interviews, published articles, reports, documents and books, internet websites, and public domain materials from internet websites (electronic books, archived documents etc.). Definitions Agreement (Also: Contract) A legal document that binds two or more parties to specific and implied obligations. Client-architect contract A written form of contract between architect and client for professional architectural services. Client-contractor contract Contract between owner and contractor for a construction project. Consortium A group of private sector entities who have joined together to bid for a project. Design-Build (DB) A procurement or project delivery arrangement whereby a single entity is entrusted with both design and construction of a project. Design-Bid-Build (DBB) Traditional contracting method in which design and construction phases of a construction project are bid and performed by two independent contractors under two distinct contracts. Design-Build-Finance-Operate (DBFO) Design, Build, Finance and Operate. A contract whereby one company undertakes a contract to perform these things for the length of the concession. General contractor A business entity that provides independent contractor services to owners directly or with the use of subcontractors. Main contractor A company that agrees to furnish labour, materials, equipment and associated services to perform the work as specified for a specified price. Private sector The domain where projects are funded with capital other than from taxes. Public sector The government domain where projects are funded with monies that comes in whole or in part from taxes. Special purpose vehicle (SPV) The project company established by the sponsors which has as its sole purpose the delivery of a project. Subcontract A written form of agreement between the turnkey or main contractor and another contractor or supplier for the satisfactory performance of services or delivery or material as set forth in the plans and specifications for a specific project. Turnkey contractor An individual, company, firm, partnership, corporation, association or other legal entity that is permitted by law to provide the necessary design and construction services, including engineering, architecture, construction contracting, and contract administration. 1.0 Contracts Prior to analysing which form of project will allow the general contractor to change its role and how is the general contractor allowed to change roles within a single project, it is necessary to outline what each individual contractual role and responsibilities are within a project. Such identification allows for a more accurate analysis to answer the research questions presented in the problem statement section of this study. 1.1 What is a Turnkey Contract? A turnkey contract is a business agreement between the client and a general contractor, where the general contractor (now turnkey contractor) is responsible for the design, engineering, construction and management of the project. The construction industry refers to the turnkey contractor as a single point of responsibility, a phrase that reflects the turnkey contractors role and contractual obligations. Note: The client can award the turnkey contract to either an architect or a general contractor, however this dissertation continues on the premise that a general contractor is awarded the turnkey contract. The turnkey contract is a product of the Design-Build (DB) project delivery system i.e. it is a method by which the client controls the project from start to finish. The turnkey contractor may subcontract an architect to perform the design work and trade contractors to perform specific works in the turnkey contract. A turnkey contract can also be used in a Design-Build-Operate (DBO) project delivery strategy. While the turnkey contractor is responsible for providing design, engineering, construction and management services, it is also obligated to operate the facility once it is fully constructed and equipped for purpose. The purpose of DBO is to provide the client with the opportunity to let a turnkey contractor in a multidisciplinary contract: to design, build and operate as opposed to individual agreements to govern the different facets of a project (Sunna, 2009). In a DB project the client has a direct relationship with the general contractor, and the general contractor has a direct relationship with the architect as shown in Figure 1. In the DBO project, the client has a direct relationship with the general contractor, where the turnkey contract (see Figure 1) will include stipulations for operating the facility once completed. Figure An example of a DB project delivery system 1.2 What is a Main Contract? The main contract is a contract awarded by the client to a general contractor to execute the main construction works in the project. The client initially awards the chosen architect to prepare drawings, specifications, and other design elements for the project. After the architects submission is received the client then puts to tender the construction works for the project. This could be broken into several tenders, one of which is the main construction work. The general contractor who wins this bid is awarded the main contract. The general contractor (now main contractor) may subcontract one or more trade contractors to carry out specific works in the main contract. The main contract is a result of the Design-Bid-Build (DBB) project delivery system, a method through which the client controls the project. DBB consists of three parties: the client, the design party and the construction party. The client is responsible for providing the project site, all the necessary clearances from the relevant authorities and funding for the architect and contractors to complete the project. The budget is an important part of the project as it allows the architect to design a building that meets the clients requirements and it determines the scope of the project. The design party includes the architect, specification writers (consultants), engineers (structural, electrical, mechanical), interior designers, quantity surveyors and other participants the architect considers necessary for completing the project. The clients involvement in the project is to monitor and evaluate progress and perform quality assurance that the turnkey contractor is moving according to schedule and within budget. The turnkey contractor in turn liaises with the client and subcontractors on a regular basis to perform its quality, quantity, time and budget control. The construction party consists of the main contractor who is responsible for providing the workforce, material, equipment, machinery and professional expertise to complete the project in accordance with the design and plan documents which are provided by the architects. In a DBB project the client has a direct relationship with the architect and the main contractor (where the architect and contractor have an indirect relationship) shown in Figure 2. Figure An example of a DBB project delivery system 2.0 Private Finance Initiative This section focuses on the Private Finance Initiative (PFI) in an effort to answer the research question: What kind of project will allow the general contractor to change its role? The research on project delivery systems and procurement methods show that the PFI involves both the public sector and the private sector working in collaboration to develop a project. 2.1 What is the Private Finance Initiative? The private finance initiative (PFI) is a way by which public infrastructure projects are funded with private capital. Initiated by the Australian and United Kingdom governments, PFI has been adopted in many countries by corporations, national governments, and international bodies such as the World Bank and the World Trade Organization. In general, under PFI, the government (public sector) is the client and invites the private sector to bid on a project, which includes construction work, services, operation and maintenance. Because these projects require a variety of inputs the government and a single private company or a consortium of companies in the private sector place a bid on the project, and work in collaboration to execute the project. The concept of PFI is to involve the private sector in public sector services or projects, because it has multiple positives it enables governments to provide national infrastructure such as bridges, motorways, power-supply, etc., at an earlier and quicker pace to the public; it provides business opportunities to the private sector; it increases employment; and, it offers better value for money. When a project is awarded, the public and private parties (in this case the government and private companies) create a new private company to manage the project and deposit the required funds in this projects accounts. These funds are used to initiate and implement the project. For a construction project after the building is fully operational, if the private companies made an agreement for the maintenance of the building over a period of for example, 25 years; the government will reimburse the cost of the project (including interest) over time. Alternatively, the government does not pay the private companies their share of the costs but allows the private companies to maintain, operate and manage the facility (bridge, toll road etc.) and recoup their costs and some profit over an agreed number of years. PFI is also known as Design-Build-Finance-Operate/Maintain (DBFO, DBFM or DBFO/M). The private sector designs, finances and constructs a new facility under a long-term lease, and/or operates and maintains the facility during the term of the lease. The private consortium transfers the new facility to the public sector at the end of the lease term. 2.1.1 Contract Process under PFI A government authority signs a contract with a private party (a company or a group of companies) creating a public-private partnership (PPP). The PPP is created for the purpose of providing the PFI contract. A PPP is a legally-binding contract between a public authority and a private consortium for the provision of assets and the delivery of services that allocates responsibilities among the various partners. Before the PPP is established a private company creates a new company in collaboration with other private companies, this is referred to as a Special Purpose Vehicle (SPV). The SPV is made up of private investors, a construction company, a maintenance company and a bank lender/s. SPV contracts with the government creating a PPP, and also with general contractors responsible for constructing and maintaining the building or infrastructure facility. The banks funding PFI projects are repaid by SPV, from payments received from the government over the duration of the PFI contract. The repayments are based on the SPVs ability to meet the requirements specified in the contract. 2.1.2 PFI Project Organisation Structure See Figure 3, the SPV is divided into subgroups: A holding company, private investors/bank lenders and a services or operating company. The primary contract is between the government and the SPV, and the requirements in the specification transmit from the SPV to the holding company, the investors and operating company through secondary contracts, and then filter down to the trade contractors. Figure Example of a PFI project organisation structure What kind of project will allow the general contractor to change its role? A PFI project created through the partnership of the government and the SPV allows for a general contractor to change its role. As shown in Figure 2, the SPV is a part client (from the SPVs perspective) and a turnkey contractor (from the governments perspective). 2.2 How PFI allows a general contractor to change their role Once a PPP contract is signed a new company is formed to finance the project. Referring to Figure 2, the SPV is considered as the client in this project because the government requires additional funding for the service or building project and is allowing the private party (the holding company, the investors and operating company) to partially privatise the project. However, the government is still part owner; from the governments perspective the SPV is both a part owner and a general contractor. Note: In a PFI project a client can also be a general contractor, depending on the project, this is known as owner-builder. In Figure 2 the SPV is both financing and operating the project, depending on how the SPV wants deliver the project, Figure 2 assumes that the general contractor (in the project environment) is a main contractor, therefore the SPV will have a client-contractor relationship. But the government is still a part client to the project therefore the SPV is also considered as the turnkey contractor to the project. 3.0 Novation This section focuses on Novation which is a situation in which a main contractor can be also turnkey contractor. 3.1 What is Novation? The business dictionary defines novation as the substitution of an original party to a contract with a new party, or substitution of an original contract with a new contract. Once the original party is replaced, the original partys obligations are discharged, and the new party is responsible for the replaced partys obligations. Novation can only occur when all the parties involved agree to replacing a party or replacing a contract. For example: novation might occur when one company buys another company where both companies are providing project services to the client, in this case the single company formed by the merger of the two companies will receive the novated contract. By replacing the obligations of the original party the main contractor all the parties involved (client, architect/engineer, and main contractor) in the original contract must agree for the replacing to take place. If the agreement to replace comes into effect, the new party will take over the responsibilities and obligations of the replaced party, i.e. the new general contractor will become a replacement to the original main contractor. According to Michael Rowlinson (2010), if the main contractor is being replaced with a new general contractor the clients role in the project remains unchanged (the client being the contracting party). 3.2 Process of Novation In the early phases of a DBB project, the design work is carried out by an architect selected by the client. The contract between the client and architect specifies the professional services the architect will provide for the projects duration. Part of the contract may include stipulations for the architect to be novated to a general contractor, see figure 4. When the novation occurs, for example; after a general contractor is awarded the main contract before the project is implemented, the client novates the client-architect contract to the main contractor, thereby novating the architects responsibilities and obligations. Generally, the architect is re-hired by the general contractor to complete the design work. The client is only passing the risk and responsibility for design to the general contractor after the tender. In a DB project, the general contractor is completely liable for the design work, including the selection of architects. With novation the client selects the architect and novates them to the general contractor at a later stage. Figure 4 illustrates how novation affects the contractual relationship in a DBB project. The Client (A) contracts with an architect (B) and with a general contractor (C). Later, the client wants to create a single point of responsibility for both design and construction, therefore the client (A) novates the architects rights and responsibilities to the general contractor. Figure Example of before and after effect of novation in a DBB project 4.0 The Case Study A case study is used to illustrate the practice of PFI projects. This case will provide insight to the role of the public and private parties, and how this information is used to find how a general contractor is able to act as both a main and turnkey contractor. 4.1 Newcastle PFI Project Medical Service Facilities Development A contract was signed between the Newcastle-upon-Tyne Hospitals NHS Trust (public party) and a private consortium led by Equion plc, in May 2005. The contract was signed for a PFI project consisting of developing the Freeman Hospital and Royal Victoria Infirmary (RVI) in Newcastle, United Kingdom (UK). The purpose of this project is to improve the medical services in Newcastle, and transferring all of the hospital services from the Newcastle General Hospital site to the new facilities available in the Freeman Hospital and the RVI sites. The Newcastle-upon-Tyne Hospitals NHS Trust promoted the project, which had a total capital of approximately GBP 300M. The PFI project involved constructing new facilities, renovating and refurbishing the existing facilities. The Freeman Hospital will receive a cancer and renal services centre, and a new multi-storey car park. RVI received an operating theatre, a new accident emergency department, with all the clinical support services required, such as neurosciences, infectious diseases, traumatic orthopaedics, dermatology and critical care. Additionally, childrens services were integrated into a purpose-built facility adjoining the main development, (Newcastle-upon-Tyne Hospitals NHS Trust, 2005). Figure Newcastle PFI project organisation structure See Figure 5, the PFI was established to make the Newcastle-upon-Tyne Hospitals NHS Trust responsible for the clinical care of patients, maintenance of equipment and existing facilities, technologically advancement medical equipment, and managing the multi-storey car park, after the new facilities were fully equipped for their purpose. Healthcare Support (Newcastle) Limited, controlled by Equion plc, (through subcontracts) provided the designing and construction work, non-clinical services and maintenance for a period of 38 years. 5.0 Discussion The research on PFI in section 2.0 of this dissertation explains that the public authority is the client in a PFI project; however the public authority is collaborating with a private consortium for ownership of the project. Through this ownership the public authority is allowing the private consortium to partially privatise the finished facility and/or service once the project is complete. Because the public authority requires the facility and/or service to be available, the private consortium is responsible for providing it. Therefore the private consortium is responsible for the design and construction of the project. The private consortium is made-up of separate entities: a holding company, a construction company, an operation and maintenance company, bank lender/s and private investors. The design and construction works are subcontracted to the construction company. Theoretically, the public authority can novate their rights and responsibilities to the private consortium making them the client, however in PFI the private consortium is responsible for completing the project, and novation would not alter their responsibilities in the projects organisation structure. However, if the public authority novated their rights and responsibilities for the project to the private consortium, the private consortium is able to privatise the project in its entirety. Using the data presented in the previous section, the Newcastle-upon-Tyne Hospitals NHS Trust is the client through PFI and Healthcare Support (Newcastle) Limited is the private consortium. See Figure 5, the relationship between the Trust and Healthcare Support is a PPP contract: they are legally bound to each other for the provision of the facilities and services within the project. The relationship between Healthcare Support and Laing ORourke is a design and construct contract, whereby Laing ORourke is responsible for the design and construction through a subcontract of the PPP. From Laing ORourkes perspective, Healthcare Support is Laing ORourkes client. It is important to consider that Healthcare Support, although collaborating with Trust, is still responsible for outcome of the project i.e. is responsible for the quality of the design, engineering, construction, management and maintenance for the project. These responsibilities are typical of a turnkey contractor. Now Healthcare support is both a client and a turnkey contractor within the project. In further detail, Healthcare Support is a turnkey contractor to the Newcastle-upon-Tyne Hospitals NHS Trust, and a client to Laing ORourke. It is also important to note that Laing ORourke is responsible for the design and construction of the new facilities; however Interserve (Facilities Management) Ltd. is legally obligated to Healthcare Support for the maintenance of both the existing facilities and advanced medical equipment. From a Healthcare Supports perspective Laing ORourke is a turnkey contractor (see Figure 5). If Healthcare Support contracted with an architect and a general contractor separately, the general contractor would be a main contractor. Theoretically, the Trust collaborates with Healthcare support, Healthcare support then contracts with an architect to design the project, after the design is approved general contractors place their bids. Healthcare awards the winning general contractor a main contract. 6.0 Summary In the beginning of the PFI project, the public authority is the client and the holding company is a turnkey contractor. The holding company then subcontracts an architect for the design, once the design is approved; the holding company tenders the construction work. The holding company then subcontracts a general contractor for the construction work, where the general contractor is now the main contractor within the project, shown in Figure 6. Figure Example PFI project If the holding company is bought out by a competitor or investor, merges with another entity, the holding company can novate the architects rights and responsibilities to the main contractor, if all the parties agree to this contractual change. The main contractor is now the turnkey contractor, shown in Figure 7. Figure Follow-up to Figure 6 including novation Alternatively, if the holding company becomes bankrupt during the project, the holding company can novate its rights and responsibilities to the new holding company that substituted the original party. This new holding company can re-organise the contracts (through novation) to make the main contractor a turnkey contractor, responsible for the design, engineering, construction and management services for the rest of the project. 7.0 Conclusion Based on the finding of this study, during the project due to changes in the client or contractor status the client-contractor relationship can evolve and a general contractor can act as both a main contractor and a turnkey contractor within a single project through PFI procurement. However, this can only occur through novation: If the client decides to change the relationship with the general contractor, and the general contractor is agreeable to that change, the client is able to novate the contract. A general contractor is able to initially act as a main contractor; however only through novation can a main contractor become a turnkey contractor, because novation occurs within a single project. Therefore a general contractor is able to act as both a main and turnkey contractor in different phases during the projects duration through a novation of the original contract. 8.0 Putting into Perspective The information presented in this dissertation may be used by private sector clients/owners who may or may not have professional experience in building construction projects, and wish to know alternative options when choosing project delivery systems to implement their project. Prospective owners may choose to use the information in this dissertation when considering stipulations for novation in their agreements with building professionals i.e. architects and general contractors, if they (the owner) wish to have control over the designs that dictate the buildings final appearance, and then transfer the responsibility for any ongoing design work to the general contractor. This dissertation can provide an undergraduate studying a degree relevant to project management and the building industry, with information pertaining to alternative contracting and relationships between individual parties in different phases of building construction projects.

Sunday, January 19, 2020

Comparing Women in The Bell Jar and Enormous Changes at the Last Minute

Independent Women in The Bell Jar and Enormous Changes at the Last Minute      Ã‚  Ã‚   The women's movement was in full swing in America in the sixties. These were the women who were escaping from their kitchens, burning their bras, and working in careers that were traditionally male-oriented, while at the same time demanding payment equal to men's salaries. In her essay: What Would It Be Like if Women Win, Gloria Steinem has many thoughts on the ways feminism could change this country and what the society would be like if her changes were made. An interesting change she is looking to make involves sexual hypocrisy: "No more sex arranged on the barter system, with women pretending interest, and men never sure whether they are loved for themselves or for the security few women can get any other way" (Steinem, Takin' it to the Streets, 476). This new attitude can be found in much of the literature of the sixties. Specifically, in two of the books we have read, women authors have projected this concept of a "new sexual women" into their characters.    The main character in Sylvia Plath's novel, The Bell Jar, could be the spokesperson for all of Steinem's ideas. Esther Greenwood breaks all of the traditional rules that a female in her time should have been following. Esther is a bold and independent woman. Which makes Buddy Willard, he... ...or this reason, and not just because her mother wants to serve her husband, that she delivers them. She is not willing to be a servant.    The women authors of the sixties incorporate many ideas of the feminine movement into their works. Their characters are strong and independent. They make bold choices, like their creators, and that is what makes them interesting.    Works Cited Bloom, Alexander and Wini Breines, eds. Takin' it to the Streets. Oxford University Press, New York, 1995) Paley, Grace. Enormous Changes at the Last Minute. Farrar, Strauss, and Giroux, New York, 1974. Plath, Sylvia. The Bell Jar. Harper and Row, New York, 1971.   

Saturday, January 11, 2020

Public Libraries: The Way To Human Understanding Essay

A Discussion on the Process of Human Intelligence and Its Progress Knowledge is one primary reason why the human society continues to advance in terms of understanding and comprehension of advancement. This is the reason why governments around the world are already aiming to increase their competencies in terms of educational progress among their human population. It is innate among humans to be fascinated by the different things that they particularly see around them. It could not be denied then that through the years, this particular fascination within the different elements that could be seen in the human environment actually developed into the many discoveries and inventions that humans produced.   Through passing civilization of humans, it could be observed that the people were never contented with what they already have or what they have already accomplished. This is especially true in terms of science and technology as well as in arts and literature. It is indeed undeniable that people recreate the things that are already existent within their own society.   The fact that they have already been able to see what they could do regarding a certain type of field, they intend to even do better the net time that they deal with the same invention. Yes, humans never get tired of reinventing everything there is in the environment. Why is this so? Human intelligence has always been noted by philosophers as the primary factor that makes the human creation different from that of the other God-made creations. The humans’ ability to innovate their own achievements to even better results for the present generation to see, has particularly noted them to be those who are capable of reinventing themselves to be able to evolve from generations to generations. To discuss this particular fact further, take an example of the human literature. It is overwhelming enough to see that the society today is already flooded by the informations that are presented to humans through the printed pages of literature. More than that, the emergence of internet technology has paved the way even for amateur writers to make mention of their thoughts to the world for them to be appreciated and particularly affect other’s opinions as well. Literature before was primarily defined as an art of writing that follows certain rules that are strict enough to keep its standards within the classical range of reading. However, when the different generations along with the historical events covered the human generation’s development, the art of literature became one of the major process by which humans intended to express their thoughts and their predicaments about the things that are going on in the world. As a result, more and more people joined the bandwagon of writing and began to share their thoughts to the world with regards the issues that primarily concern the human society today. This particular progress in literature has primarily been further fueled by the democratic arrangement of the major governments around the world, giving a chance for the freedom of human expression. It is through this that people became more aware of the world around them, they cared more than ever with the political agendas, the social issues as well as other informations that concern their interests. True, the changing situation in the society and the demand towards progress requires that human intelligence be perfected in a way that it particularly caters to the needs of the entire humanity. The human brain’s ability to store and restructure informations that were accepted by it through the years of an individual’s life is particularly a proof that the application of humans’ intelligence could still be perfected as generations are still to come along. Public libraries are continuously assisting in the process of actually making it possible for humans to make considerable progress in terms of knowing what is present within the society that they are living in. Both young and poor are likely to have better chances of understanding the society through the existence of public libraries. Funding for these types of public institutions serve as primary investments on the part of the   different governments around the world as they are certainly to make great impact to the people, educating them with the knowledge that they ought to understand and apply in further practical actuality in the society for the sake of progress.   References: Robert J. Sternberg. (1989). Handbook of Human Intelligence. Cambridge University Press.

Friday, January 3, 2020

Brave New World Double Entry Journals Essay - 2092 Words

Double Entry Journals Quotes/Summary of Event | My Thinking, Questions, Connections amp; Reactions | Pg. 8 â€Å"SI MONUMENTUM REQUIRIS CIRCUMSPICE† | I know this language is Latin. In the forward it is used in a way to honor educators. I think this might say â€Å"A monument that requires searching†Online it says, â€Å"if you seek his monument, look around†. (Merriam Webster). It seems similar to what I thought it said originally. I wasn’t surprised that it was along the lines of looking for something because the word circumspice reminded me of the English word circum-navigate. | Pg. 10 â€Å"This really revolutionary revolution is to be achieved, not in the external world, but in the souls and flesh of human beings.† | This line is being used to†¦show more content†¦| Pg. 35 â€Å"Two children, a little boy of about seven and a little girl who might have been a year older, were playing, very gravely and with all the focused attention of scientists intent on a labor of discovery, a rudimentary sexual game.â€Å"Charming, charming!† the D.H.C. repeated sentimentally.† | Is it just me or is it weird that the society pushes promiscuously on kids age 7 and 8. Also the director seems to enjoy watching the two kids erotic behavior. | Pg. 35 â€Å"This little boy seems rather reluctant to join in the ordinary erotic play. ..... â€Å"And so,† she went on, turning back to the Director, â€Å"I’m taking him in to see the Assistant Superintendent of Psychology. Just to see if anything’s at all abnormal.† | Maybe there isn’t anything wrong with the boy, BNW society is basically forcing little kids to explore/have sex with each other. What can the superintendent of psychology tell you other than that the kid doesn’t want too have sex. It is also creepy that they all look the exact same. | Pg. 39 â€Å"Our Ford’s: History is bunk. History,† he repeated sl owly, â€Å"is bunk.†Ã¢â‚¬  | I know in real life Henry Ford said something along those lines; â€Å"History is more or less bunk. Its tradition. We dont want tradition. We want to live in the present, and the only history that is worth a tinkers damn is the history that we make today. (Chicago Tribune, 1916). | Pg. 41 â€Å"I’veShow MoreRelatedChris Krakauer s Non Fiction Book Into The Wild1515 Words   |  7 Pages24-year-old McCandless’s brief sojourn in the Alaskan wilderness and the events leading to his death, offering opinions from individuals who criticized the young man’s arrogance and foolhardiness as well as those who extolled McCandless as a noble, brave hero. To establish an extreme and unyielding stance on Chris McCandless – viewing him as either a righteous idealist or an inexperienced dunderhead – would disregard McCandless’s nuanced personality and his sensitive familial circumstances. When oneRead MoreAnalysis O f George Orwell s 1984 1970 Words   |  8 Pageswrote: I understand HOW: I do not understand WHY.’ (101) From his very introduction, Winston shows an intense, introspective intellect in his journal entries and monologues, without becoming too far removed from the average person. Throughout the novel, Winston transforms from a small, uncertain figure whose paranoia governs most of his actions to a brave, albeit reckless, man driven by passion. Through his approachable manner, Orwell succeeds in adding a very personal note to 1984, as Winston’sRead MoreRole of Hafiz Government Employment Project in Decreasing Unemployment in Saudi Arabia3483 Words   |  14 PagesRegion Challenge for Saudi Government Conclusion Introduction There is no doubt in saying the Kingdom of Saudi Arabia has been successful in managing to maintain its economic conditions despite the recession and financial crises in all parts of the world. However, the economic success of any nation cannot simply be measured by how it attracts the foreign investment or how much surplus money it has. The economic success of any nation is actually measured by its ability to give employment to its peopleRead MoreThe Hobbit Double Entry Journal Prompts3406 Words   |  14 PagesNicholas Gangone Ms. Sottas Double Entry Journal Prompts March 20, 2013 â€Å"But men remembered little of all that, though some still sang old songs of the dwarf-kings of the Mountain, Thror and Dragon, and the fall of the lords of Dale.† (Tolkien 176) â€Å"I hope I never smell the smell of apples again.† (Tolkien 179) â€Å"But the Master was not sorry at all to let them go. They were expensive to keep, and their arrival had turned things into a long holiday in which business was a standstill.† (TolkienRead MoreCurriculum For English Learners Beginner Level 210689 Words   |  43 Pagesand the world around them. Learning English, in a personal perspective is Curriculum for English Learners Beginner Level 2’s objective. With numerous activities for practice that would make the students feel comfortable, to encourage them to explore and express themselves confidently, in English. Through this curriculum, we will show the learners that it is fun to express themselves, and it is good to express it in different language. Good luck. CONTENTS UNIT 1 THE WORLD AROUND MERead MoreBrand Audit Examples10459 Words   |  42 Pagesmarketing directors see extensions of an existing brand as the key way of launching new products and services in the next two or three years, compared with only 3 percent for new brand creation. Although strongly supported by marketers, 27 percent of all line extensions fail according to the Association of National Advertisers. Nijssen (1999) states that while line extensions are the most common method of introducing new products, research has primarily focused on brand extensions. Although lineRead MoreIs Protectionism Ever Justified6199 Words   |  25 Pagesprotectionism i. Infant industries ii. Free Trade iii. Anti- dumping iv. Environmental factors v. Employment opportunities and the concept of balance of payments disequilibrium vi. Cultural influences c. Protectionism vs. Free Trade d. An analysis based on % news articles from, The Economist i. Appendix.1 ii. Appendix.2 iii. Appendix.3 iv. Appendix.4 v. Appendix.5 e. Conclusion Is Protectionism ever justified? Explain with examples. a. Introduction Protectionism is said to be a â€Å"Government’s actionsRead MoreEssay on Walmart16417 Words   |  66 PagesGlobal 500 list in 2012, the biggest private employer in the world with over two million employees, and is the largest retailer in the world. Walmart remains a family-owned business, as the company is controlled by the Walton family, who own a 48 percent stake in Walmart.[5][6] It is also one of the worlds most valuable companies.[7] The company was founded by Sam Walton in 1962, incorporated on October 31, 1969, and publicly traded on the New York Stock Exchange in 1972. It is headquartered in BentonvilleRead MoreStandardisation and Adaptation Within International Marketing Context24708 Words   |  99 Pages2.2.2 Introduction Choice of Methodology Choice of study case Information Collection Shiseido Web-site Cosmetics Personal Care Industry Related Site General Business Web Site for the analysed Region Beauty Sites Online Shopping Site Electronics Journal Choices and Description of theories ‘AdaptStand’ Approach Competitive Analysis iii 3 Shiseido—A global multi-branded cosmetic giant 3.0 3.1 3.2 3.2.1 3.2.2 3.3.3 3.3 3.3.1 3.3.2 3.3.3 3.3.3.1 3.3.3.2 3.3.3.3 3.3.3.4 3.3.3.5 3.4 3.5 3.6 3Read MorePolice Corruption9501 Words   |  39 Pagesis ethically wrong for a person to intentionally offer the police gratuities in order to get either enhanced service in the form of their increased presence or a pass on minor violations that might otherwise be enforced, such as not ticketing the double-parked customers of the store that routinely offers the gratuity† (p. 25). Gratuities such as the example above can eventually influence an officer’s decision to perform or not perform specific duties that are expected of him or her. When an officer